Delivery of CFM56-7B engines

CamX was requested to perform the delivery project of a pair of CFM56-7B engines on behalf of our customer Air Lease Corporation. One engine was already removed from the aircraft, the second engine was still installed.

After an intensive 3 week period CamX managed to retrieve all required documents, assess them, have them corrected where needed and concluded by a successful acceptance. This way both engines are documented according to the highest standard and ready to be delivered to the next operator.

Both engines are now stored ready for their next assignment.